Real Solar and Battery Projects in Southern California

Aug 21, 202610.12 kW Main House & ADU Solar Installation | Arcadia, CA | SafePower
10.12 kW System | 23 x 440W Panels | 2-Day Install

Aug 14, 2026Companies Can't Cut Peak Demand Charges with Rooftop Solar Alone
Banking the Sun at Noon, Spending It at Night – How Storage Delivered 18% Savings for a Commercial Park

Aug 14, 2026800kW Manufacturing Plant, U.S
An 800 kW U.S. manufacturing plant needed to end outage downtime and rising energy costs. We deployed a hybrid microgrid (1.5 MW solar, 600 kW / 1,205 kWh storage, 1.2 MW diesel, EMS-controlled), delivering zero production-stopping events, ~29% lower rate, and ~84% less diesel within three months. Zero downtime; lower bills; less diesel: resilient, low-carbon operations.